Changes outside working pattern
A metric showing the number of changes (commits) made outside of a team's working hours or days.
Available dimensions:
- Workload
- Repository group
Data source
The source of the data is the set of commit timestamps from the version control system configured for the workload.
Query details
Changes are shown if they are made outside the configured working pattern for the team.
Category | Range |
---|---|
Low | Up to 1 hour |
Medium | Up to 3 hours |
High | More than 3 hours or outside working pattern days |
Configuration
Configure a working pattern for a team in its workload configuration.
workloads:
- id: my-team
name: My Team
team:
workingPattern:
# Starting hour (24 hour clock).
# Default: 9
startHour: number
# End hour (24 hour clock).
# Default: 17
endHour: number
# Day name or number (0-6, starting on Sunday).
# Default: "Monday"
startDay: number | string
# Day name or number (0-6, starting on Sunday).
# Default: "Friday"
endDay: number | string
# The timezone to use for working pattern calculations.
# e.g. `UTC` or `America/New_York`.
# Default: "UTC"
timezone: string